March is again upon us and there is very little model railroad activity in the works. The end of the month brings RailRun, an annual activity in the Boston area where many FUNTRAK club members have had the good fortune to be participants in the past. A large number of the local model railroad layouts are opened up to a select group of modelers for operating sessions over a weekend at the end of the month. This year, Brian, along with club members Lorenzo Franchi and John Fleming, as well as our Canadian neighbor David
King, have been invited to attend this happening. Participation in this annual event often leads to many ideas about other ways of operating model railroads, including club layouts.
When there is actually a purpose for the trains other than to just go in a circle, it makes for much more interesting train running. FUNTRAK continues attempting to
incorporate this idea of operations into the T-trak displays. This has been a slow and ongoing task, but progress is being made and hopefully will be more successful in the future. The RailRun experience provides encouragement for club members to develop more operational ideas for use in our club layouts when the opportunity arises.
The idea of having a purpose has lead to the construction of specific modules that have particular industries on them to support railroad usage and encourage operations. With industry, schedules, and a purpose, it is easier to develop a plan for operations. The one-trak concept has been a work in progress for nearly two years now and lends itself greatly to supporting the operations concept with the t-trak modules. Although DCC adds to the enjoyment of operations because of the added features allowing trains to operate without having to accommodate conventional DC methods, FUNTRAK’s one-trak modules are being constructed with conventional DC power in mind. This allows anyone to use their own motive power regardless if it is DCC equipped or conventional. All DCC locomotives have a conventional feature while not all conventional locomotives can run on DCC. A great advantage of T-trak is that no two setups need ever be the same and the diversity of modules means operations will be ever changing to maintain more interest and challenge for operators. With all of these things in mind, FUNTRAK has managed to keep ahead of the game by planning ahead in the design of many of the T-trak modules, anticipating the inclusion of the modules in a layout design to accommodate operations using the features mentioned. These considerations have made FUNTRAK‘s layouts both interesting and fun for both operators and viewers.
The annual “Valley Rail Sights” club show coming up in April should prove to be more fun than ever this year if many of these operational ideas are included when setting up the T-trak layout. Come onout and join the fun.
Brian