Newsletter – February 2024

Loader Loading…
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab
Comments Off on Newsletter – February 2024 more...

Newsletter – January 2024

Loader Loading…
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab
Comments Off on Newsletter – January 2024 more...

Newsletter – December 2023

Loader Loading…
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download

Comments Off on Newsletter – December 2023 more...

Newsletter – November

Loader Loading…
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab
Comments Off on Newsletter – November more...

Newsletter – October 2023

Loader Loading…
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download

Comments Off on Newsletter – October 2023 more...

Newsletter – September 2023

Loader Loading…
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab
Comments Off on Newsletter – September 2023 more...

Valley Rail Sights

Click for a link to our April Valley Rail Sights Show Flyer:

Apr17Flyer(1)

Comments Off on Valley Rail Sights more...

Operators Desk

On July 16, Funtrak joined Jim Heidt at his home in Clockville NY for a model railroad operating session. Jim’s railroad follows a freelanced route from Pennsylvania through New York State to the St. Lawrence area. Jim’s railroad is dictated by a timetable that helps maintain a smooth operation around the layout. Aiding is a dispatch station and several station agents at key locations around the layout. While passenger trains bring its patrons around to various highly detailed locations around the layout, coal, ore, mixed freight and interchange traffic bring commodities to and from several key cities and towns. Jim’s layout featured finely crafted scenes, well maintained track, smooth operating engines and rolling stock and a well crafted plan for operation. Additionally, Jim and his operators were hospitable to the many guests that joined them for the operating sessions. The priveldge to operation on a fine layout provides not only enjoyment to the operators but also helps provide ideas and insights for their own modeling and operating schemes. Photos from Jims layout are below.

imageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimageimage

Comments Off on Operators Desk more...

Operator’s Desk

On Tuesday May 12, Funtrak made the journey to operate Bernie Messenger’s HO layout. Brian, John, Matthew, Greg and Rick made the trip to Sauquiot. John operated the yard and Brian ran some locals, while Matthew, Greg and Rick ran main line trains. Operations provide a challenge whether you are new to operating or a seasoned veteran. The key to good operations are smooth running track and equiptment, a good routing system and a visually stimulating layout, all of which Bernie provided. The layout spanned Buffalo to Albany, or Boston following a freelanced route across New York State. Car cards featuring eight locations on laminated card stock and marked with wet erase markers made picking up and delivering commodities easy. Also, a unique feature on the layout was the construction of the staging yards. Eight track yards on drawer sliders made entering and leaving the yards easy without extended switches or yard ladders. Check out some photos of our session below.

 

image image image image image image image image image image image image image image image image image

Comments Off on Operator’s Desk more...

From the Desk: April 2016

he Easter bunny came early this year so Easter is now over. While the holiday has come and gone, FUNTRAK’s construction phase carries on. As mention on
page one, two projects for the n scale t-trak portion of
FUNTRAK’s modular railroad
systems are in the works, John’s
triple mine module and the
mountain tunnel double. These
two projects have lead to much
discussion within the FUNTRAK
ranks about some new concepts.
In Australia, Mark Bean is
actively working on implementing
some of these newer ideas in his
module construction plans.
FUNTRAK would need to build some
new mountain modules to
accommodate these fresh ideas,
but that is a very good
possibility for the future.
FUNTRAK has notably been in the
forefront of incorporating new
ideas into the t-trak concept.
Some of the ideas proposed
include developing an interface
that goes under the mountain
line to the inside of the layout
from the yellow line and
eventually works its way up to
the mountain line via a two
percent incline. All this is
being designed to be inside the
traditional loop. One of the
drawbacks is that the mountain
corners would need to be
separate so modules could be
inserted between them to make
room for the track work inside
the layout. This might mean
using banquet tables side by
side as well as lengthwise, but
this still only makes a layout
five feet wide. The advantage to
this is that this would provide
a means of servicing industries
in the mountain region of the
layout and provide more reasons
for operations on the layout.

Comments Off on From the Desk: April 2016 more...

  • Events

    23 Nov
    23 Nov 24
    Albany
    23 Nov
    23 Nov 24
    Hamburg
    08 Dec
  • Monthly Newsletters

    Click to download a PDF version of FUNTRAK TIMES!

    Funtrak April Newsletter

    Funtrak May Newsletter
  • Copyright © 1996-2014 FUNTRAK. All rights reserved.
    Privacy Policy | Graphics and Website Design by aka design | iDream theme by Templates Next | Powered by WordPress | Hosted by Bluehost
    KeepandShare.com(R) Free Calendar